La Paz County property record for 4906 River Bluff Ln, Parker, AZ 85344
| Property Type | Mobile Home |
|---|---|
| Details | 1,792 sqft · built 1989 |
| Lot Size | 0.289 acres (12,632 sqft) |
| Owner | 2 Individual Names on File |
| Last Sale | $300,000 (Oct 2018) |
| Tax Bill | $1,545 (2025) |
| Flood Zone | Zone X (moderate risk) |
| APN | 310-35-139C |
| Primary APN | 310-35-139C |
|---|---|
| Alternative APN |
|
| Stories | 1 Story |
|---|---|
| Building Area | 1,792 sqft Living Area |
| 1st Floor Area | 1,792 sqft |
| Year Built | Built 1989 |
|---|---|
| Architectural Style | Mobile/Manufactured |
| Exterior Material | Plywood |
| Construction Type | Steel Frame |
| Lot Area | 12,632 sqft (0.289 acres) |
| Garage Type | Detached |
| Parking Spaces | 3 Parking Spaces |
| Porch | Open Porch |
| Canopy | 1,320 sqft |
| Storage Building | 80 sqft |
| Cooling System | HVAC |
|---|---|
| Heating System | Hot Water |
| Account Number | R0001611 |
|---|---|
| Street Address | 4906 RIVER BLUFF LN |
| City | PARKER |
| State | AZ |
| Zip | 85344-8680 |
| Property Category | Residential |
| Property Type | Residential > Prefabricated > Mobile Home |
| Legal Description | SUBDIVISION: RANCHERO ESTATES UNIT ONE LOT: C-6 AND THE SLY 1/2 OF LOT C-7 SECTION: 27 TOWNSHIP: 11N RANGE: 18W SERIAL: 54720 |
| Legal Range | 18W |
| Legal Township | 11N |
| Legal Section | 27 |
| Legal Subdivision | RANCHERO ESTATES |
| Legal Block | 11N |
| Legal Lot Number | C |
| Jurisdiction | LA PAZ AZ |
| Township / Civil Division | PARKER |
| Census Block Group | 1 |
| Census Block | 1050 |
| Census Tract | 20202 |
Source: La Paz County assessment roll, as of January 1, 2026
Owner names and exact recorded amounts shown locked on this page are available instantly with a free trial.
| Owner of Record | 2 Individual Names on File |
|---|---|
| Mailing Address | 12322 OAKWOOD ST, GARDEN GROVE, CA 92840-3416 |
| Owner Type | Individual |
| Deed Names | 2 Verified Names on Deed |
|---|---|
| Last Sale | Oct 10, 2018 · Amount on Record |
| Deed Sale | Oct 10, 2018 · Amount on Record |
| Deed Document Number | 2018-03420 |
| Record Updated | Jun 8, 2026 |
Source: La Paz County assessment roll, as of January 1, 2026
| Type | Name |
|---|---|
| State | Arizona |
| County | La Paz County |
| Unified School District | Parker Unified School District (PK - 12) |
| Year | Tax Bill | Assessed Value | Assessed Market Value |
|---|---|---|---|
| 2026 | $146,367 (+5%) | $273,239 (-36.66%) | |
| 2025 | $1,545.00 (+10.75%) | $139,397 (+10.25%) | $431,364 (+6.07%) |
| 2023 | $1,395.00 (+15.67%) | $126,437 (+5%) | $406,692 (+169.7%) |
| 2022 | $1,206.00 | $120,416 | $150,796 |
Assessed value and assessed market value are set for property tax purposes, not market price estimates; both are a fraction of this property's market value.
Source: FEMA National Flood Hazard Layer, effective October 2, 2025 · OpenFEMA NFIP redacted claims and policies, as of September 2026
| FEMA Flood Zone | Zone X moderate risk |
|---|---|
| 500-Year Floodplain | Yes 0.2% annual chance |
| Nearest Special Flood Hazard Area | Zone AE, within 500 ft |
| Flood Insurance Requirement | Not required lenders may require it |
| Flood Insurance Cost | Premium on Record median of 11 policies |
| Nearby Flood Policies | 11 in force |
| Nearby Flood Claims | 10 (1983–2018) |
| Claims Outside the SFHA | 1 of 10 |
| Most Recent Claim | Aug 2018 · rainfall accumulation |
Values are read at the parcel center point; flood claims are located to the census block group, not this parcel; lenders make the official flood determination.
Source: USDA Forest Service Wildfire Risk to Communities (2nd edition), as of 2024
| Wildfire Risk | Low lower than 94% of the US · lower than 99.1% of Arizona |
|---|---|
| Wildfire Likelihood | Under 0.01% annual chance |
| Exposure | Indirect within ember reach |
Source: EPA Safe Drinking Water Information System, as of September 2026
| Water System | EPCOR - HOLIDAY HARBOR private · serves 559 people · EPA ID AZ0415058 |
|---|---|
| Water Source | Surface water |
| Last State Inspection | Feb 2024 |
| Lead | Under 1 ppb (2023) action level 15 ppb |
| Water Quality | Treatment failure resolved · Oct 2020 Turbidity resolved · Sep 2020 |
|---|---|
| Treatment and Procedure | None last 10 years |
| Monitoring and Reporting | 1 last 3 years |
Results are for the whole water system, not water tested at this address; lead at the tap also depends on the building's own pipes.
Source: FCC Broadband Data Collection, based on 475 locations within half a mile, as of December 31, 2025
| Provider | Max Down / Up (Mbps) |
|---|---|
| Optimum Communications Cable | 500 / 20 |
| Starlink Satellite | 280 / 30 |
May also be available: Verizon.
5G (outdoors only) and 4G LTE
Search by:
By searching, you agree to: Terms • Privacy • Disclosures