Mason County property record for 80 E Dabob Rd, Shelton, WA 98584
| Property Type | Mobile Home |
|---|---|
| Details | 1 bd · 1 ba · 1,188 sqft · built 2017 |
| Lot Size | 0.25 acres (10,890 sqft) |
| Owner | Individual Name on File |
| Tax Bill | $3,585 (2025) |
| Flood Zone | Zone X (minimal risk) |
| APN | 22007-51-00027 |
| Primary APN | 22007-51-00027 |
|---|
| Bedrooms | 1 Bed |
|---|---|
| Full Baths | 1 Bath |
| Plumbing Fixtures | 13 Plumbing Fixtures |
| Stories | 2 Stories |
| Building Area | 1,188 sqft Living Area |
| 1st Floor Area | 1,188 sqft |
| Year Built | Built 2017 |
|---|---|
| Effective Year Built | Effective 2017 |
| Architectural Style | Mobile Home |
| Exterior Material | Concrete |
| Construction Type | Frame |
| Roof Material | Composition Shingle |
| Lot Area | 10,890 sqft (0.25 acres) |
| Lot Width | 65 ft Width |
| View / Lot | Water |
| Deck Area | 280 sqft |
| Patio Area | 561 sqft |
| Cooling System | HVAC |
|---|---|
| Heating System | Heat Pump |
| Street Address | 80 E DABOB RD |
|---|---|
| City | SHELTON |
| State | WA |
| Zip | 98584 |
| Property Category | Residential |
| Property Type | Residential > Prefabricated > Mobile Home |
| Local Zoning Code | RR5 |
| Legal Description | TIMBERLAKE #8 TR 27 |
| Legal Subdivision | TIMBERLAKE #8 |
| Legal Tract | 27 |
| Jurisdiction | MASON WA |
| Township / Civil Division | TIMBER LAKE-HARSTINE ISLAND |
| Census Block Group | 3 |
| Census Block | 3001 |
| Census Tract | 961102 |
80 E Dabob Rd, a mobile home, is owned by an individual.
Source: Mason County records, as of May 27, 2026
| Owner of Record | Individual Name on File |
|---|---|
| Mailing Address | 8230 KASTER DR NE, BREMERTON, WA 98311-4135 |
| Owner Type | Individual |
Owner names and exact recorded amounts are on file and can be viewed instantly on this page with a free 10-day trial.
| Deed Names | Name on Deed |
|---|---|
| Record Updated | Sep 20, 2026 |
The 2025 property tax bill for 80 E Dabob Rd was $3,585, up 3.1% from the year before.
Source: Mason County assessment roll, as of May 27, 2026
| Type | Name |
|---|---|
| State | Washington |
| County | Mason County |
| Unified School District | Pioneer School District (PK - 12) |
| Year | Tax Bill | Assessed Value | Assessed Market Value |
|---|---|---|---|
| 2026 | $445,225 Land $131,755 Building $313,470 | $445,225 Land $131,755 Building $313,470 | |
| 2025 | $3,585.00 (+3.11%) | ||
| 2024 | $3,477.00 (+58.12%) | $445,810 Land $110,985 Building $334,825 | $445,810 Land $110,985 Building $334,825 |
| 2023 | $2,199.00 | ||
| 2022 | $246,085 Land $83,565 Building $162,520 | $246,085 Land $83,565 Building $162,520 |
Assessed value and assessed market value are set for property tax purposes and are not market price estimates.
FEMA maps place 80 E Dabob Rd in Zone X, an area of minimal flood risk, within 100 ft of a high-risk flood zone.
Source: FEMA National Flood Hazard Layer, effective October 15, 2020 · OpenFEMA NFIP redacted claims and policies, as of September 2026
| FEMA Flood Zone | Zone X minimal risk |
|---|---|
| Nearest Special Flood Hazard Area | Zone A, within 100 ft |
| Flood Insurance Requirement | Not required lenders may require it |
| Nearby Flood Policies | 3 in force |
Values are read at the parcel center point; flood claims are located to the census block group, not this parcel; lenders make the official flood determination.
Wildfire risk around 80 E Dabob Rd is low, with a 0.01% annual chance of wildfire.
Source: USDA Forest Service Wildfire Risk to Communities (2nd edition), as of 2024
| Wildfire Risk | Low lower than 80% of the US · lower than 84% of Washington |
|---|---|
| Wildfire Likelihood | 0.01% annual chance |
| Exposure | Indirect within ember reach |
| Adjoins Burnable Land | Yes |
Values cover an area roughly 900 ft across, not the parcel itself; insurers use their own ratings.
Source: EPA Safe Drinking Water Information System, as of September 2026
| Water System | TIMBERLAKE COMMUNITY CLUB INC private · serves 2,337 people · EPA ID WA5388370 |
|---|---|
| Water Source | Groundwater |
| Last State Inspection | Jul 2022 |
| Lead | 5 ppb (2023–2025) action level 15 ppb |
| Water Quality | None last 10 years |
|---|---|
| Treatment and Procedure | None last 10 years |
| Monitoring and Reporting | None last 3 years |
Results are for the whole water system, not water tested at this address; lead at the tap also depends on the building's own pipes.
Source: FCC Broadband Data Collection, based on 71 locations within half a mile, as of December 31, 2025
| Provider | Max Down / Up (Mbps) |
|---|---|
| Hood Canal Communications Cable | 1,000 / 20 |
| Starlink Satellite | 280 / 30 |
4G LTE (outdoors only), no 5G reported
Search by:
By searching, you agree to: Terms • Privacy • Disclosures