Davie County property record for 428 Bobbit Rd, Advance, NC 27006
| Property Type | Manufactured or Modular Home |
|---|---|
| Details | 3 bd · 2 ba · 1,344 sqft · built 1998 |
| Lot Size | 9.8 acres (426,888 sqft) |
| Owner | 2 Individual Names on File |
| Last Sale | $330,000 (Feb 2007) |
| Tax Bill | $844 (2025) |
| Deeds & Mortgages | Jan 2023 Transfer Sep 2019 Transfer |
| Flood Zone | Zone X (minimal risk) |
| APN | D600000004 |
| Primary APN | D600000004 |
|---|---|
| Alternative APNs |
|
| Bedrooms | 3 Beds |
|---|---|
| Full Baths | 2 Baths |
| Stories | 1 Story |
| Building Area | 1,344 sqft Heated Area |
| Gross Area | 1,600 sqft |
| 1st Floor Area | 1,344 sqft |
| Flooring | Carpet |
| Interior Walls | Wallboard/Drywall |
| Fireplaces | 1 Fireplace |
| Fireplace | Fireplace |
| Year Built | Built 1998 |
|---|---|
| Effective Year Built | Effective 1998 |
| Architectural Style | Modular |
| Exterior Material | Aluminum/Vinyl |
| Roof Type | Gable |
| Roof Material | Asphalt |
| Lot Area | 426,888 sqft (9.8 acres) |
| Lot Width | 40.4 ft Width |
| Garage Type | Carport |
| Garage Area | 240 sqft |
| Carport | Carport |
| Carport Area | 240 sqft |
| Porch | Screened Porch |
|---|---|
| Porch Area | 160 sqft |
| Deck Area | 256 sqft |
| Patio Area | 512 sqft |
| Total Buildings | 2 Buildings |
| Cooling System | Central |
|---|---|
| Heating System | Heat Pump |
| Heating Fuel | Electric |
| Account Number | 8312201 |
|---|---|
| Street Address | 428 BOBBIT RD |
| City | ADVANCE |
| State | NC |
| Zip | 27006-6605 |
| Property Category | Residential |
| Property Type | Residential > Prefabricated > Manufactured or Modular Home |
| Local Zoning Code | R20 |
| Legal Description | 11.20 AC BOBBIT RD (9.67 AC) |
| Legal Subdivision | SURVEY OF NORMAN BLAKE |
| Jurisdiction | DAVIE NC |
| Township / Civil Division | FARMINGTON |
| Census Block Group | 3 |
| Census Block | 3011 |
| Census Tract | 80200 |
Source: Davie County records · APN D600000004
Assessment roll updated September 15, 2025 · Last verified August 2026
Owner names and exact recorded amounts shown locked on this page are available instantly with a free trial.
| Owner of Record | 2 Individual Names on File |
|---|---|
| Mailing Address | 526 BOBBIT RD, ADVANCE, NC 27006-6671 |
| Owner Type | Individual |
| Date | Document |
|---|---|
| Jan 26, 2023 | Intrafamily Transfer, Transfer |
| Sep 25, 2019 | Quit Claim Deed, Transfer NOT AVAILABLE |
| Deed Names | 2 Verified Names on Deed |
|---|---|
| Last Sale | Feb 06, 2007 · Amount on Record |
| Deed Sale | Feb 06, 2007 · Amount on Record |
| Prior Sale | Mar 01, 1957 |
| Deed Document Number | 2007953 |
| Deed Book / Page | 699 / 340 |
| Last Transfer Date | Jul 21, 2023 |
| Transfer Doc | 0000003547 |
| Record Updated | Sep 20, 2026 |
| Document Type | Intrafamily Transfer |
|---|---|
| Jurisdiction | DAVIE NC |
| Recording Date | Jan 26, 2023 |
| Property Address | 428 BOBBIT RD, ADVANCE, NC 27006-6605 |
| Document Number | 0124000590 |
| Book / Page | 1240 / 590 |
| Map Reference | MB 13 PG 624 |
| Instrument Date | Jan 26, 2023 |
| Instrument | 389 |
| Transaction Type | Transfer |
| Record Updated | Oct 03, 2023 |
| Tax | $0.00 |
|---|---|
| Amount Accuracy | No Consideration Stated |
| Additional |
|
| Name | Verified Name |
|---|
| Name | Verified Name |
|---|---|
| Address | 526 BOBBIT RD, ADVANCE, NC 27006-6671 |
| Document Type | Quit Claim Deed |
|---|---|
| Jurisdiction | DAVIE NC |
| Recording Date | Sep 25, 2019 |
| Property Address | 428 BOBBIT RD, ADVANCE, NC 27006-6605 |
| Document Number | 0000004941 |
| Book / Page | 001116 / 001128 |
| Instrument Date | Sep 23, 2019 |
| Instrument | 4941 |
| Transaction Type | Transfer |
| Record Updated | Oct 15, 2019 |
| Title Company | NOT AVAILABLE |
| Tax | $0.00 |
|---|---|
| Additional |
|
| Name | Verified Name |
|---|
| Name | Verified Name |
|---|---|
| Address | 526 BOBBIT RD ADVANCE NC 270066671, ADVANCE, NC 27006-6671 |
Source: Davie County records · Assessment roll updated September 15, 2025 · Last verified August 2026
| Type | Name |
|---|---|
| State | North Carolina |
| County | Davie County |
| Unified School District | Davie County Schools (PK - 12) |
Assessed value is set for property tax purposes, not a market price estimate; it is a fraction of this property's market value.
| Year | Tax Bill | Assessed Value | Assessed Market Value |
|---|---|---|---|
| 2025 | $844.00 (+28.85%) | $122,690 (+44.72%) | $225,060 (+51.68%) Land $139,270 Building $85,790 |
| 2023 | $655.00 Additional exemption filed | $84,780 | $148,380 Land $93,950 Building $54,430 |
Source: FEMA National Flood Hazard Layer as of April 17, 2022 · USDA Forest Service Wildfire Risk to Communities as of 2024 · Last verified October 2026
| FEMA Flood Zone | Zone X minimal risk |
|---|---|
| Flood Insurance Requirement | Not required lenders may require it |
| Wildfire Risk | Low lower than 80% of the US · lower than 76% of North Carolina |
|---|---|
| Wildfire Likelihood | 0.04% annual chance |
| Exposure | Indirect within ember reach |
| Adjoins Burnable Land | Yes |
Values are read at the parcel center point; lenders make the official flood determination.
Source: FCC Broadband Data Collection as of December 31, 2025 · Last verified October 2026
| Provider | Max Down / Up (Mbps) |
|---|---|
| Yadkin Valley Telephone Membership Fiber | 6,000 / 6,000 |
Based on FCC filings for 8 locations within half a mile of this property.
5G (outdoors only) and 4G LTE
Source: EPA Safe Drinking Water Information System as of 2026 Q3 · EPA water system boundaries as of March 2026 · Last verified October 2026
| Water System | DAVIE COUNTY WATER SYSTEM serves 32,068 people |
|---|---|
| Water Source | Surface water |
| Last State Inspection | Apr 2025 |
| Lead | Under 1 ppb (2023–2025) action level 15 ppb |
| Water Quality | Turbidity resolved · Jul 2022 Failure to filter resolved · Jul 2022 |
|---|---|
| Treatment and Procedure | None last 10 years |
| Monitoring and Reporting | 1 last 3 years |
Results are for the whole water system as reported to EPA, not water tested at this address; lead at the tap also depends on the building's own pipes. The full violation and enforcement history is in the system's EPA record.
Search by:
By searching, you agree to: Terms • Privacy • Disclosures