Mason County property record for 372 E Pointes Dr E, Shelton, WA 98584
| Property Type | Seasonal / Vacation Home |
|---|---|
| Details | 3 bd · 3 ba · 1,572 sqft · built 1994 |
| Lot Size | 0.11 acres (4,792 sqft) |
| Owner | 2 Individual Names on File |
| Tax Bill | $4,317 (2025) |
| Flood Zone | Zone X (minimal risk) |
| APN | 12119-50-00154 |
| Primary APN | 12119-50-00154 |
|---|
| Bedrooms | 3 Beds |
|---|---|
| Full Baths | 3 Baths |
| Plumbing Fixtures | 12 Plumbing Fixtures |
| Stories | 1 Story |
| Building Area | 1,572 sqft Living Area |
| Gross Area | 2,061 sqft |
| 1st Floor Area | 1,572 sqft |
| Fireplaces | 1 Fireplace |
| Fireplace | Fireplace |
| Year Built | Built 1994 |
|---|---|
| Effective Year Built | Effective 1994 |
| Exterior Material | Combination |
| Construction Type | Frame |
| Roof Material | Composition Shingle |
| Lot Area | 4,792 sqft (0.11 acres) |
| View / Lot | Water View |
| Garage Type | Attached |
| Garage Area | 462 sqft |
| Parking Spaces | 2 Parking Spaces |
| Porch | Covered Slab |
|---|---|
| Porch Area | 25 sqft |
| Deck Area | 253 sqft |
| Patio Area | 263 sqft |
| Cooling System | Central |
|---|---|
| Heating System | Forced Air with A/C |
| Street Address | 372 E POINTES DR E |
|---|---|
| City | SHELTON |
| State | WA |
| Zip | 98584-9418 |
| Property Category | Residential |
| Property Type | Residential > Specialized > Seasonal / Vacation Home |
| Local Zoning Code | RR5 |
| Legal Description | HARTSTENE POINTE LOT: 154 |
| Legal Subdivision | HARTSTENE POINTE |
| Legal Lot Number | 154 |
| Jurisdiction | MASON WA |
| Township / Civil Division | TIMBER LAKE-HARSTINE ISLAND |
| Census Block Group | 1 |
| Census Block | 1001 |
| Census Tract | 961101 |
Source: Mason County assessment roll, as of May 27, 2026
Owner names and exact recorded amounts shown locked on this page are available instantly with a free trial.
| Owner of Record | 2 Individual Names on File |
|---|---|
| Mailing Address | 372 E POINTES DR E, SHELTON, WA 98584-9418 |
| Occupancy | Owner Occupied |
| Owner Type | Individual |
| Deed Names | 2 Verified Names on Deed |
|---|---|
| Last Transfer Date | May 30, 2025 |
| Transfer Doc | 0002226164 |
| Record Updated | Sep 20, 2026 |
Source: Mason County assessment roll, as of May 27, 2026
| Type | Name |
|---|---|
| State | Washington |
| County | Mason County |
| Unified School District | Pioneer School District (PK - 12) |
| Year | Tax Bill | Assessed Value | Assessed Market Value |
|---|---|---|---|
| 2026 | $606,305 (+9.98%) Land $118,140 Building $488,165 | $606,305 (+9.98%) Land $118,140 Building $488,165 | |
| 2025 | $4,317.00 (+8.14%) | $551,295 (-) Land $125,400 Building $425,895 | $551,295 (-) Land $125,400 Building $425,895 |
| 2024 | $3,992.00 (-7.01%) | $551,295 (+11.71%) Land $125,400 Building $425,895 | $551,295 (+11.71%) Land $125,400 Building $425,895 |
| 2023 | $4,293.00 | ||
| 2022 | $493,485 Land $118,390 Building $375,095 | $493,485 Land $118,390 Building $375,095 |
Assessed value and assessed market value are set for property tax purposes and are not market price estimates.
Source: FEMA National Flood Hazard Layer, effective October 15, 2020 · OpenFEMA NFIP redacted claims and policies, as of September 2026
| FEMA Flood Zone | Zone X minimal risk |
|---|---|
| Nearest Special Flood Hazard Area | Zone VE, within 500 ft |
| Flood Insurance Requirement | Not required lenders may require it |
| Nearby Flood Policies | 6 in force |
Values are read at the parcel center point; flood claims are located to the census block group, not this parcel; lenders make the official flood determination.
Source: USDA Forest Service Wildfire Risk to Communities (2nd edition), as of 2024
| Wildfire Risk | Low lower than 95% of the US · lower than 97.1% of Washington |
|---|---|
| Wildfire Likelihood | Under 0.01% annual chance |
| Exposure | Direct burnable vegetation at the parcel |
Source: EPA Safe Drinking Water Information System, as of September 2026
| Water System | HARTSTENE POINTE serves 460 people · EPA ID WA5331569 |
|---|---|
| Water Source | Groundwater |
| Last State Inspection | Nov 2023 |
| Lead | 9 ppb (2022–2024) action level 15 ppb |
| Water Quality | Arsenic resolved · Oct 2017 |
|---|---|
| Treatment and Procedure | None last 10 years |
| Monitoring and Reporting | None last 3 years |
Results are for the whole water system, not water tested at this address; lead at the tap also depends on the building's own pipes.
Source: FCC Broadband Data Collection, based on 196 locations within half a mile, as of December 31, 2025
| Provider | Max Down / Up (Mbps) |
|---|---|
| Starlink Satellite | 280 / 30 |
| Lumen Technologies DSL | 100 / 10 |
May also be available: AT&T, Mason County Public Utility District No. 3, Northwest Fiber, T-Mobile USA, Verizon.
5G (outdoors only) and 4G LTE
Search by:
By searching, you agree to: Terms • Privacy • Disclosures