Brazoria County property record for 340 Alaska Dr, Angleton, TX 77515
| Property Type | Mobile Home |
|---|---|
| Details | 1,216 sqft · built 1997 |
| Lot Size | 0.027 acres (1,216 sqft) |
| Owner | Individual Name on File |
| Tax Bill | $161 (2024) |
| Flood Zone | Zone AE (high risk) |
| APN | 9620-0042-248 |
| Primary APN | 9620-0042-248 |
|---|---|
| Alternative APNs |
|
| Stories | 1 Story |
|---|---|
| Building Area | 1,216 sqft Living Area |
| 1st Floor Area | 1,216 sqft |
| Year Built | Built 1997 |
|---|---|
| Architectural Style | Mobile/Manufactured |
| Lot Area | 1,216 sqft |
| Lot Dimensions | 76 ft deep x 16 ft wide |
| Porch | Open Porch |
| Heating Fuel | Electric |
|---|
| Account Number | MH508006 |
|---|---|
| Street Address | 340 ALASKA DR |
| City | ANGLETON |
| State | TX |
| Zip | 77515 |
| Property Category | Residential |
| Property Type | Residential > Prefabricated > Mobile Home |
| Legal Description | MOBILE HOME ONLY,SN1 TXFLR12A71394FD;HUD# TEX0500745;TITLE # 01179118,16X76 FLEETWOOD 1994 16X76 FLEETWOOD 1994 |
| Legal Subdivision | ANGLETON MH COMM |
| Legal Block | 248 |
| Jurisdiction | BRAZORIA TX |
| Township / Civil Division | ANGLETON |
| Census Block Group | 1 |
| Census Block | 1039 |
| Census Tract | 662100 |
Source: Brazoria County records · APN 9620-0042-248
Assessment roll updated August 1, 2025 · Last verified December 2025
Owner names and exact recorded amounts shown locked on this page are available instantly with a free trial.
| Owner of Record | Individual Name on File |
|---|---|
| Mailing Address | 10 LOBO CT, ANGLETON, TX 77515-2716 |
| Owner Type | Individual |
| Deed Names | Verified Name on Deed |
|---|---|
| Record Updated | Jun 08, 2026 |
Source: Brazoria County records · Assessment roll updated August 1, 2025 · Last verified December 2025
| Type | Name |
|---|---|
| State | Texas |
| County | Brazoria County |
| Municipality | Holiday Lakes Town |
| Unified School District | Angleton Independent School District (PK - 12) |
Assessed value and assessed market value are set for property tax purposes and are not market price estimates.
| Year | Tax Bill | Assessed Value | Assessed Market Value |
|---|---|---|---|
| 2025 | $8,200 (-) Building $8,200 | $8,200 (-) Building $8,200 | |
| 2024 | $161.00 | ||
| 2023 | $8,200 Building $8,200 | $8,200 Building $8,200 |
Source: FEMA National Flood Hazard Layer, Brazoria County (48039C), updated September 9, 2026 · FEMA OpenFEMA NFIP redacted claims and policies, census block group 480396621001, refreshed September 2026 · USDA Forest Service Wildfire Risk to Communities, 2nd edition (2024), fuels as of 2020 · Last verified October 2026
| FEMA Flood Zone | Zone AE high risk |
|---|---|
| 100-Year Floodplain | Yes 1% annual chance |
| Floodway | No |
| Base Flood Elevation | Varies along the reach; see FIRM |
| Flood Insurance Requirement | Required federally backed loans |
| Flood Insurance Cost | Premium on Record median of 194 policies |
| Nearby Flood Policies | 194 in force |
| Nearby Flood Claims | 318 (1979–2024) |
| Claims Outside the SFHA | 47 of 318 |
| Most Recent Claim | Jul 2024 · Hurricane Beryl |
| Claims by Event |
|
| Wildfire Risk | Moderate above 56% of the US · lower than 63% of Texas |
|---|---|
| Wildfire Likelihood | 0.2% annual chance |
| Exposure | Indirect within ember reach |
| Adjoins Burnable Land | Yes |
Values are read at the parcel center point; flood claims are located to the census block group, not this parcel; lenders make the official flood determination.
Source: FCC Broadband Data Collection, availability as of December 31, 2025 · sampled at 161 locations within half a mile · Last verified October 2026
| Provider | Max Down / Up (Mbps) |
|---|---|
| Xfinity Cable | 2,000 / 250 |
| Stratosnet Technologies Fixed Wireless | 100 / 50 |
May also be available: AT&T, Verizon.
Source: EPA Safe Drinking Water Information System via ECHO, 2026 Q3 · EPA community water system boundaries v3.0, March 2026 · Last verified October 2026
| Water System | TOWN OF HOLIDAY LAKES serves 921 people |
|---|---|
| Water Source | Groundwater |
| Last State Inspection | Jan 2024 |
| Lead | Under 1 ppb (2026) action level 15 ppb |
| Water Quality | None last 10 years |
|---|---|
| Treatment and Procedure | None last 10 years |
| Monitoring and Reporting | 5 last 3 years |
Results are for the whole water system as reported to EPA, not water tested at this address; lead at the tap also depends on the building's own pipes. The full violation and enforcement history is in the system's EPA record.
Search by:
By searching, you agree to: Terms • Privacy • Disclosures