Spink County property record for 18809 379th Ave, Tulare, SD 57476
| Property Type | Single Family Home |
|---|---|
| Details | 2 bd · 1 ba · 1,080 sqft · built 1977 |
| Lot Size | 10 acres (435,600 sqft) |
| Owner | Individual Name on File |
| Tax Bill | $1,363 (2025) |
| Flood Zone | Zone X (minimal risk) |
| APN | 001360 |
| Primary APN | 001360 |
|---|
| Bedrooms | 2 Beds |
|---|---|
| Full Baths | 1 Bath |
| Plumbing Fixtures | 5 Plumbing Fixtures |
| Stories | 1 Story |
| Building Area | 1,080 sqft Living Area |
| Basement Area | 720 sqft |
| Unfinished Basement | 720 sqft |
| Year Built | Built 1977 |
|---|---|
| Effective Year Built | Effective 1977 |
| Exterior Material | Siding |
| Roof Type | Gable |
| Roof Material | Metal |
| Lot Area | 435,600 sqft (10 acres) |
| Garage Type | Attached |
| Deck Area | 96 sqft |
| Cooling System | Refrigeration |
|---|---|
| Heating System | Forced Air with A/C |
| Heating Fuel | Geothermal |
| Street Address | 18809 379TH AVE |
|---|---|
| City | TULARE |
| State | SD |
| Zip | 57476-7500 |
| Property Category | Residential |
| Property Type | Residential > Single Family > Home |
| Legal Description | NE 1/4 OF NE 1/4 OF NE 1/4 26-114-65 |
| Legal Range | 65 |
| Legal Township | 114 |
| Legal Section | 26 |
| Legal Lot Number | 26 |
| Jurisdiction | SPINK SD |
| Township / Civil Division | BUFFALO |
| Census Block Group | 2 |
| Census Block | 2366 |
| Census Tract | 100 |
Source: Spink County assessment roll, APN 001360, as of October 2, 2025 · Last verified April 2026
Owner names and exact recorded amounts shown locked on this page are available instantly with a free trial.
| Owner of Record | Individual Name on File |
|---|---|
| Mailing Address | 18809 379TH AVE, TULARE, SD 57476-7500 |
| Occupancy | Owner Occupied |
| Owner Type | Individual |
| Deed Names | Verified Name on Deed |
|---|---|
| Record Updated | Jun 08, 2026 |
Source: Spink County assessment roll as of October 2, 2025 · Last verified April 2026
| Type | Name |
|---|---|
| State | South Dakota |
| County | Spink County |
| County Subdivision | Buffalo Township |
| Unified School District | Hitchcock-Tulare School District 56-6 (PK - 12) |
Assessed value and assessed market value are set for property tax purposes and are not market price estimates.
| Year | Tax Bill | Assessed Value | Assessed Market Value |
|---|---|---|---|
| 2025 | $1,363.00 (+110.34%) | $114,219 (+13.73%) Land $29,511 Building $84,708 | |
| 2023 | $648.00 | $100,429 Land $23,422 Building $77,007 | |
| 2020 | $68,470 Land $13,860 Building $54,610 |
Source: FEMA National Flood Hazard Layer, Spink County (46115C), as of March 24, 2025 · FEMA OpenFEMA NFIP redacted claims and policies, census block group 461150001002, as of September 2026 · USDA Forest Service Wildfire Risk to Communities, 2nd edition, as of 2020 · Last verified October 2026
| FEMA Flood Zone | Zone X minimal risk |
|---|---|
| Flood Insurance Requirement | Not required lenders may require it |
| Nearby Flood Policies | 7 in force |
| Nearby Flood Claims | 19 (2009–2019) |
| Claims Outside the SFHA | 13 of 19 |
| Most Recent Claim | Apr 2019 · Severe Winter Storm, Snowstorm, And Flooding |
| Claims by Event |
|
| Wildfire Risk | Low lower than 93% of the US · lower than 89% of South Dakota |
|---|---|
| Wildfire Likelihood | 0.03% annual chance |
| Exposure | None beyond ember reach |
Values are read at the parcel center point; flood claims are located to the census block group, not this parcel; lenders make the official flood determination.
Source: FCC Broadband Data Collection, 2 locations within half a mile, as of December 31, 2025 · Last verified October 2026
| Provider | Max Down / Up (Mbps) |
|---|---|
| Venture Communications Cooperative Fiber | 1,000 / 1,000 |
5G (outdoors only) and 4G LTE
Source: EPA Safe Drinking Water Information System, water system SD4602175, as of 2026 Q3 · EPA water system boundaries as of March 2026 · Last verified October 2026
| Water System | MID-DAKOTA RURAL WATER private · serves 11,833 people |
|---|---|
| Water Source | Surface water |
| Last State Inspection | Jan 2024 |
| Lead | 2 ppb (2025) action level 15 ppb |
| Water Quality | None last 10 years |
|---|---|
| Treatment and Procedure | None last 10 years |
| Monitoring and Reporting | None last 3 years |
Results are for the whole water system as reported to EPA, not water tested at this address; lead at the tap also depends on the building's own pipes. The full violation and enforcement history is in the system's EPA record.
Search by:
By searching, you agree to: Terms • Privacy • Disclosures