Clallam County property record for 106 Vancouver Pl, Sequim, WA 98382
| Property Type | Single Family Home |
|---|---|
| Details | 3 bd · 2.5 ba · 1,186 sqft · built 1979 |
| Lot Size | 0.222 acres (9,673 sqft) |
| Owner | 2 Individual Names on File |
| Tax Bill | $2,803 (2025) |
| Flood Zone | Zone X (minimal risk) |
| APN | 0330085602840000 |
| Primary APN | 0330085602840000 |
|---|---|
| Alternative APN |
|
| Bedrooms | 3 Beds |
|---|---|
| Full Baths | 2.5 Baths |
| Half Baths | 1 Half Bath |
| Stories | 2 Stories |
| Building Area | 1,186 sqft Living Area |
| Gross Area | 2,306 sqft |
| 1st Floor Area | 1,186 sqft |
| Basement Area | 560 sqft |
| Fireplaces | 1 Fireplace |
| Fireplace | Fireplace |
| Year Built | Built 1979 |
|---|---|
| Effective Year Built | Effective 1979 |
| Architectural Style | Bi-Level |
| Exterior Material | Combination |
| Roof Type | Gable |
| Roof Material | Composition Shingle |
| Lot Area | 9,673 sqft (0.222 acres) |
| Garage Type | Attached |
| Garage Area | 560 sqft |
| Parking Spaces | 2 Parking Spaces |
| Porch | Porch |
| Cooling System | Central |
|---|---|
| Heating System | Forced Air with A/C |
| Heating Fuel | Electric |
| Account Number | 18510 |
|---|---|
| Street Address | 106 VANCOUVER PL |
| City | SEQUIM |
| State | WA |
| Zip | 98382-9330 |
| Property Category | Residential |
| Property Type | Residential > Single Family > Home |
| Local Zoning Code | URH |
| Legal Description | LOT 144 SUNLAND DIV NO 8 |
| Legal Range | 03 |
| Legal Township | 30 |
| Legal Section | 08 |
| Legal Subdivision | SUNLAND DIVISION |
| Legal Lot Number | 144 |
| Jurisdiction | CLALLAM WA |
| Township / Civil Division | SEQUIM |
| Census Block Group | 2 |
| Census Block | 2003 |
| Census Tract | 1902 |
106 Vancouver Pl, a single family home, is owned by two individuals.
Source: Clallam County records, as of May 21, 2026
| Owner of Record | 2 Individual Names on File |
|---|---|
| Mailing Address | 2191 ASHTON AVE, MENLO PARK, CA 94025-6501 |
| Owner Type | Individual |
Owner names and exact recorded amounts are on file and can be viewed instantly on this page with a free 7–day trial.
| Deed Names | 2 Names on Deed |
|---|---|
| Record Updated | Sep 20, 2026 |
The 2025 property tax bill for 106 Vancouver Pl was $2,803.
Source: Clallam County assessment roll, as of May 21, 2026
| Type | Name |
|---|---|
| State | Washington |
| County | Clallam County |
| Unified School District | Sequim School District (PK - 12) |
| Year | Tax Bill | Assessed Value | Assessed Market Value |
|---|---|---|---|
| 2026 | $372,926 Land $75,400 Building $297,526 | $372,926 Land $75,400 Building $297,526 | |
| 2025 | $2,803.00 | ||
| 2023 | $2,668.00 | ||
| 2022 | $347,846 Land $71,500 Building $276,346 | $347,846 Land $71,500 Building $276,346 |
Assessed value and assessed market value are set for property tax purposes and are not market price estimates.
FEMA maps place 106 Vancouver Pl in Zone X, an area of minimal flood risk.
Source: FEMA National Flood Hazard Layer, effective April 22, 2025 · OpenFEMA NFIP redacted claims and policies, as of September 2026
| FEMA Flood Zone | Zone X minimal risk |
|---|---|
| Flood Insurance Requirement | Not required lenders may require it |
| Nearby Flood Policies | 5 in force |
Values are read at the parcel center point; flood claims are located to the census block group, not this parcel; lenders make the official flood determination.
Wildfire risk around 106 Vancouver Pl is low, with a 0.01% annual chance of wildfire.
Source: USDA Forest Service Wildfire Risk to Communities (2nd edition), as of 2024
| Wildfire Risk | Low lower than 80% of the US · lower than 84% of Washington |
|---|---|
| Wildfire Likelihood | 0.01% annual chance |
| Exposure | Indirect within ember reach |
Values cover an area roughly 900 ft across, not the parcel itself; insurers use their own ratings.
Source: EPA Safe Drinking Water Information System, as of September 2026
| Water System | SUNLAND WATER DISTRICT serves 2,235 people · EPA ID WA5385260 |
|---|---|
| Water Source | Groundwater |
| Last State Inspection | Jul 2023 |
| Lead | 5 ppb (2022–2024) action level 15 ppb |
| Water Quality | None last 10 years |
|---|---|
| Treatment and Procedure | None last 10 years |
| Monitoring and Reporting | None last 3 years |
Results are for the whole water system, not water tested at this address; lead at the tap also depends on the building's own pipes.
Source: FCC Broadband Data Collection, based on 262 locations within half a mile, as of December 31, 2025
| Provider | Max Down / Up (Mbps) |
|---|---|
| Astound Broadband Cable | 1,500 / 50 |
Search by:
By searching, you agree to: Terms • Privacy • Disclosures